Power Ready Mix Pvt. Ltd. operates Pakistan's most reliable ready-mix supply chain — combining computerized twin-shaft batching plants, sub-zero flake ice chillers, 94+ hydrostatic transit mixers, and 48m mobile boom pumps.
Every piece of equipment in our fleet is maintained under rigorous preventive maintenance protocols to guarantee zero job-site downtime during continuous pours.
Our automated batching facility on Ferozepur Road houses four heavy twin-shaft compulsory mixers. Controlled by microprocessor load cells, these plants achieve rapid, homogeneous blending of aggregate sizes, OPC/SRC cement binders, fly ash, and chemical admixtures within 45 seconds per batch.
With over 94 specialized transit mixer trucks operating in our logistics fleet, we guarantee continuous, non-stop concrete delivery to major commercial plazas and infrastructure sites. Each truck features hydrostatic drum drive systems that maintain ideal drum rotation speeds during transit to preserve slump and eliminate aggregate separation.
To facilitate fast placement across multi-story buildings, deep basement raft foundations, and wide bridge decks, we maintain 12 heavy-duty mobile hydraulic boom pumps. These pumps feature multi-section Z-fold articulating booms capable of reaching high elevation points with maximum precision and zero concrete wastage.
High ambient summer temperatures in Punjab can cause premature concrete setting, slump loss, and severe thermal cracking in mass pours. To counteract this, Power Ready Mix operates two industrial sub-zero flake ice plants. Dry flake ice is automatically weighed and dosed directly into the mixing drum, holding discharge temperatures below 30°C.
Analyzing blueprint specs, slump, and volume.
Testing cement, aggregate sieve, and water purity.
Setting automated computer recipe per SBC/ASTM.
Pneumatic aggregate dosing & load-cell calibration.
Real-time moisture compensation adjustment.
Discharging fresh homogeneous concrete into drum.
Scheduling truck arrival matched with site pour rate.
Verifying slump cone & temperature prior to pour.
Operating boom pumps for slab placement.
Issuing 7-day & 28-day hydraulic compression report.